Author 1

Author 1

2. “The shortest total length of a project is determined by the longest path through the network.” Explain the theory behind this statement. Why does the longest path determine the shortest project length?

Unit 3 Project Management Application 1. Respond to the following: The advantage of Gantt charts lies in their linkage to the project schedule baseline. Explain this concept. 2. “The shortest total length of a project is determined by the longest path through the network.” Explain the theory behind this statement. Why does the longest path determine the shortest project length?  3. You are considering the decision of whether or not to crash your project. After asking your operations manager to conduct an analysis, you have determined the “pre-crash” and the “post-crash” activity durations and costs, shown in the table below. Assume all activities are on the critical path.  a. Calculate the per day costs for crashing each activity. Show your calculations.  b. Which are the most attractive candidates for crashing? Explain your answer. NORMAL CRASHED Activity Duration Cost Duration Cost A 4 days $1,000 3 days $2,000  B 5 days $2,500 3 days $5,000 C 3 days $750 2 days $1,200 D 7 days $3,500 5 days $5,000 E  2 days $500 1 day $2,000 F  5 days…

Weather and Climate Change. Read Lab 5: Weather and Climate Change. This lab will allow you to explore the water cycle through the creation of an ecosystem model. Additionally, you will observe how water moves throughout the environment and is affected by weather patterns.

SCI 207 Week 5 Lab 5 Weather and Climate Change Weather and Climate Change. Read Lab 5: Weather and Climate Change. This lab will allow you to explore the water cycle through the creation of an ecosystem model. Additionally, you…